Muskoka Rd. 117, Baysville - A 'Muskoka Main Streets' Initiative

Share Muskoka Rd. 117, Baysville - A 'Muskoka Main Streets' Initiative on Facebook Share Muskoka Rd. 117, Baysville - A 'Muskoka Main Streets' Initiative on X (formerly Twitter) Share Muskoka Rd. 117, Baysville - A 'Muskoka Main Streets' Initiative on Linkedin Email Muskoka Rd. 117, Baysville - A 'Muskoka Main Streets' Initiative link

The District of Muskoka and the Township of Lake of Bays are working together on the first ever 'Muskoka Main Streets' project, starting in Baysville. This initiative was created to strengthen the places where residents live, work, and connect, because main streets are more than just roads. They’re community gateways, economic corridors, and shared spaces.

By enhancing existing roads and building new infrastructure, we’re strengthening the foundation of our communities, supporting local economic growth, improving safety for all road and sidewalk users, and creating inviting spaces for residents, workers, and visitors alike.

This project will redevelop a 780-metre section of Muskoka Rd. 117 through the Community of Baysville. In addition to upgrading the existing road surface, the project will improve traffic flow and enhance safety for both pedestrians and drivers through traffic calming features, with a modern roundabout and pedestrian crossings. It will also add active transportation infrastructure, including a new multi-use trail and a sidewalk.

The Lake of Bays - Community Improvement Plan (External Link) was shaped by two surveys with nearly 500 responses, as well as multiple public information sessions. A key theme from the community's feedback was the need to improve the section of Muskoka Rd. 117 in Baysville.

Baysville was chosen as the first project for this program, making it a model for future initiatives across Muskoka that improve walkability, support local business, and enhance public space.

Please note that all dates and durations are subject to change due to weather, supply availability, or other unforeseen circumstances.


Project Purpose & Goals

This project responds directly to community feedback gathered through two public surveys and multiple engagement sessions. This investment also reflects a broader goal to develop consistent, high-quality, main street experiences across Muskoka's communities.

Residents called for:
* Safer pedestrian and cycling routes,
* Slower traffic through town,
* A more attractive and welcoming streetscape, and
* Better connectivity for local businesses, residents, and visitors.

What to Expect During Construction


What to Expect After Construction

🚧 New Traffic Patterns
Expect temporary adjustments as construction moves forward, with clear timelines and minimal disruption.

⚠️ Clear, Simple Signage
Watch for easy-to-navigate signs to help guide both drivers and pedestrians safely through the area.

🛑 Safety Barriers
Short-term barriers will help protect pedestrians and workers while work is underway.

🌦️ Built for Muskoka's Weather
Our upgrades are designed with all four seasons in mind. Construction will pause during the colder months and resume in Spring 2026.

🔁 Designed to Evolve
This project is built to grow with Baysville, improving how we live, move, and connect.


🚗 Traffic Calming Features
New design elements will encourage safer, slower driving to support a more pedestrian-friendly environment.

🚶‍♀️ Raised Pedestrian Crossings
These visible crossings will help prioritize pedestrian safety and improve walkability throughout the area.

⚪ Modern Roundabout
A new roundabout will support better traffic flow while making intersections safer for drivers, cyclists, and pedestrians.

/┆\ Enhanced Streetscape
Expect thoughtful landscaping, durable materials, and weather-ready features built to look great year-round.




Why Build a Roundabout on a Highway Through Town?
Improved SafetyA roundabout reduces the risk of serious crashes by slowing down vehicles and eliminating dangerous left turns and head on collisions.
Better Traffic FlowA roundabout keeps vehicles moving. This helps reduce congestion and delays, especially during busy times or tourist seasons.
Support for Local DevelopmentThis feature can help manage increased traffic from new housing, businesses, or recreational areas, making it easier for drivers to enter and exit side streets safely.
Gateway FeatureA roundabout can act as a visual “gateway” into the community, signalling to drivers that they’re entering a populated area. It encourages slower speeds and can be landscaped to reflect local identity.
Environmental BenefitsBecause vehicles don’t idle as long, they can reduce fuel use and emissions, supporting sustainability goals.



Why Now?

This project is part of a long term commitment to build safer, more vibrant communities across Muskoka. With regular updates, clear signage, and transparent communication, we'll keep you informed every step of the way.


If you have any comments or questions please fill out our Comments or Questions Form below.

The District of Muskoka and the Township of Lake of Bays are working together on the first ever 'Muskoka Main Streets' project, starting in Baysville. This initiative was created to strengthen the places where residents live, work, and connect, because main streets are more than just roads. They’re community gateways, economic corridors, and shared spaces.

By enhancing existing roads and building new infrastructure, we’re strengthening the foundation of our communities, supporting local economic growth, improving safety for all road and sidewalk users, and creating inviting spaces for residents, workers, and visitors alike.

This project will redevelop a 780-metre section of Muskoka Rd. 117 through the Community of Baysville. In addition to upgrading the existing road surface, the project will improve traffic flow and enhance safety for both pedestrians and drivers through traffic calming features, with a modern roundabout and pedestrian crossings. It will also add active transportation infrastructure, including a new multi-use trail and a sidewalk.

The Lake of Bays - Community Improvement Plan (External Link) was shaped by two surveys with nearly 500 responses, as well as multiple public information sessions. A key theme from the community's feedback was the need to improve the section of Muskoka Rd. 117 in Baysville.

Baysville was chosen as the first project for this program, making it a model for future initiatives across Muskoka that improve walkability, support local business, and enhance public space.

Please note that all dates and durations are subject to change due to weather, supply availability, or other unforeseen circumstances.


Project Purpose & Goals

This project responds directly to community feedback gathered through two public surveys and multiple engagement sessions. This investment also reflects a broader goal to develop consistent, high-quality, main street experiences across Muskoka's communities.

Residents called for:
* Safer pedestrian and cycling routes,
* Slower traffic through town,
* A more attractive and welcoming streetscape, and
* Better connectivity for local businesses, residents, and visitors.

What to Expect During Construction


What to Expect After Construction

🚧 New Traffic Patterns
Expect temporary adjustments as construction moves forward, with clear timelines and minimal disruption.

⚠️ Clear, Simple Signage
Watch for easy-to-navigate signs to help guide both drivers and pedestrians safely through the area.

🛑 Safety Barriers
Short-term barriers will help protect pedestrians and workers while work is underway.

🌦️ Built for Muskoka's Weather
Our upgrades are designed with all four seasons in mind. Construction will pause during the colder months and resume in Spring 2026.

🔁 Designed to Evolve
This project is built to grow with Baysville, improving how we live, move, and connect.


🚗 Traffic Calming Features
New design elements will encourage safer, slower driving to support a more pedestrian-friendly environment.

🚶‍♀️ Raised Pedestrian Crossings
These visible crossings will help prioritize pedestrian safety and improve walkability throughout the area.

⚪ Modern Roundabout
A new roundabout will support better traffic flow while making intersections safer for drivers, cyclists, and pedestrians.

/┆\ Enhanced Streetscape
Expect thoughtful landscaping, durable materials, and weather-ready features built to look great year-round.




Why Build a Roundabout on a Highway Through Town?
Improved SafetyA roundabout reduces the risk of serious crashes by slowing down vehicles and eliminating dangerous left turns and head on collisions.
Better Traffic FlowA roundabout keeps vehicles moving. This helps reduce congestion and delays, especially during busy times or tourist seasons.
Support for Local DevelopmentThis feature can help manage increased traffic from new housing, businesses, or recreational areas, making it easier for drivers to enter and exit side streets safely.
Gateway FeatureA roundabout can act as a visual “gateway” into the community, signalling to drivers that they’re entering a populated area. It encourages slower speeds and can be landscaped to reflect local identity.
Environmental BenefitsBecause vehicles don’t idle as long, they can reduce fuel use and emissions, supporting sustainability goals.



Why Now?

This project is part of a long term commitment to build safer, more vibrant communities across Muskoka. With regular updates, clear signage, and transparent communication, we'll keep you informed every step of the way.


If you have any comments or questions please fill out our Comments or Questions Form below.

  • Weekly Project Update - November 9

    Share Weekly Project Update - November 9 on Facebook Share Weekly Project Update - November 9 on X (formerly Twitter) Share Weekly Project Update - November 9 on Linkedin Email Weekly Project Update - November 9 link

    Work planned week of November 9 to November 13

    • Final pavement markings, including the yellow centreline, white shoulder lines, and crosswalk markings at the roundabout and pedestrian crossings, are planned for installation. Painting is weather dependent and will be completed when conditions are dry, as rain prevents roadway markings from being applied.

    Work completed week of November 2 to November 6

    • Flagpole installation in the centre of the roundabout completed
    • Crosswalks at University St and Bay St set up completed and will be put into service when pavement markings are completed.

    Community impacts

    • Motorists can expect the possibility of minor delays along Muskoka Road 117 as this work continues.

    Work planned week of November 9 to November 13

    • Final pavement markings, including the yellow centreline, white shoulder lines, and crosswalk markings at the roundabout and pedestrian crossings, are planned for installation. Painting is weather dependent and will be completed when conditions are dry, as rain prevents roadway markings from being applied.

    Work completed week of November 2 to November 6

    • Flagpole installation in the centre of the roundabout completed
    • Crosswalks at University St and Bay St set up completed and will be put into service when pavement markings are completed.

    Community impacts

    • Motorists can expect the possibility of minor delays along Muskoka Road 117 as this work continues.
  • Weekly Project Update - November 2

    Share Weekly Project Update - November 2 on Facebook Share Weekly Project Update - November 2 on X (formerly Twitter) Share Weekly Project Update - November 2 on Linkedin Email Weekly Project Update - November 2 link

    Work planned week of November 2 to November 6

    • Site cleanup and general maintenance will continue in preparation for winter shutdown.
    • Line painting is planned to be completed this week.

    Work completed week of October 26 to October 30

    • Site cleanup and maintenance.
    • Crosswalk installation complete; awaiting line painting before they will be made operational

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.

    Work planned week of November 2 to November 6

    • Site cleanup and general maintenance will continue in preparation for winter shutdown.
    • Line painting is planned to be completed this week.

    Work completed week of October 26 to October 30

    • Site cleanup and maintenance.
    • Crosswalk installation complete; awaiting line painting before they will be made operational

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.
  • Weekly Project Update - October 26

    Share Weekly Project Update - October 26 on Facebook Share Weekly Project Update - October 26 on X (formerly Twitter) Share Weekly Project Update - October 26 on Linkedin Email Weekly Project Update - October 26 link

    Work planned week of October 26 to October 30

    • Site cleanup and maintenance will continue as the project area is prepared for winter shutdown.
    • Line painting for the roadway and pedestrian walkways may take place if weather conditions permit.

    Work completed week of October 19 to October 23

    • The flagpole has been installed in the roundabout, and pedestrian crosswalk signals and crossings have been set up.
    • Site cleanup activities have been completed.

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.

    Work planned week of October 26 to October 30

    • Site cleanup and maintenance will continue as the project area is prepared for winter shutdown.
    • Line painting for the roadway and pedestrian walkways may take place if weather conditions permit.

    Work completed week of October 19 to October 23

    • The flagpole has been installed in the roundabout, and pedestrian crosswalk signals and crossings have been set up.
    • Site cleanup activities have been completed.

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.
  • Weekly Project Update - October 19

    Share Weekly Project Update - October 19 on Facebook Share Weekly Project Update - October 19 on X (formerly Twitter) Share Weekly Project Update - October 19 on Linkedin Email Weekly Project Update - October 19 link

    Work planned week of October 19 to October 23

    • Road line painting.
    • PXOs will be commissioned after line painting is completed.
    • Installation of signage
    • Site cleanup will continue, and repairs on Lake of Bays roadways may also take place.

    Work completed week of October 12 to October 16

    • New pedestrian crossings have been installed but are not yet operational
    • Proposed raised intersections are under review.

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.


    Work planned week of October 19 to October 23

    • Road line painting.
    • PXOs will be commissioned after line painting is completed.
    • Installation of signage
    • Site cleanup will continue, and repairs on Lake of Bays roadways may also take place.

    Work completed week of October 12 to October 16

    • New pedestrian crossings have been installed but are not yet operational
    • Proposed raised intersections are under review.

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.


  • Weekly Project Update - October 12

    Share Weekly Project Update - October 12 on Facebook Share Weekly Project Update - October 12 on X (formerly Twitter) Share Weekly Project Update - October 12 on Linkedin Email Weekly Project Update - October 12 link

    Work planned week of October 12 to October 16

    • Raised intersections are still under review
    • Site will continue to be cleaned.

    Work completed week of October 5 to October 9

    • Raised intersection designs reviewed
    • Site Cleaned
    • Park benches installed & trees planted

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.
    • Single lane closures will occur during paving.

    Work planned week of October 12 to October 16

    • Raised intersections are still under review
    • Site will continue to be cleaned.

    Work completed week of October 5 to October 9

    • Raised intersection designs reviewed
    • Site Cleaned
    • Park benches installed & trees planted

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.
    • Single lane closures will occur during paving.

  • Weekly Project Update - October 2

    Share Weekly Project Update - October 2 on Facebook Share Weekly Project Update - October 2 on X (formerly Twitter) Share Weekly Project Update - October 2 on Linkedin Email Weekly Project Update - October 2 link

    Work planned week of October 5 to October 9

    • Construction on the raised intersections
    • Site will continue to be cleaned.
    • Site will be hydroseeded / receive sod.

    Work completed week of September 28 to October 2

    • Raised intersection designs are being reviewed
    • Site Cleaned

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.
    • Single lane closures will occur during paving.

    Work planned week of October 5 to October 9

    • Construction on the raised intersections
    • Site will continue to be cleaned.
    • Site will be hydroseeded / receive sod.

    Work completed week of September 28 to October 2

    • Raised intersection designs are being reviewed
    • Site Cleaned

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.
    • Single lane closures will occur during paving.
  • Weekly Project Update - September 28

    Share Weekly Project Update - September 28 on Facebook Share Weekly Project Update - September 28 on X (formerly Twitter) Share Weekly Project Update - September 28 on Linkedin Email Weekly Project Update - September 28 link

    Work planned week of September 28 to October 2 

    • Continuing paving

    • Hydroseed of any disrupted soil areas.

    • Work will begin on the raised intersections

    Work completed week of September 21 to September 25 

    • Surface paving of 117

    • Crosswalk poles and electrical components installed

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.

    • Single lane closures will occur during paving.

    Work planned week of September 28 to October 2 

    • Continuing paving

    • Hydroseed of any disrupted soil areas.

    • Work will begin on the raised intersections

    Work completed week of September 21 to September 25 

    • Surface paving of 117

    • Crosswalk poles and electrical components installed

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.

    • Single lane closures will occur during paving.

  • Weekly Project Update - September 21

    Share Weekly Project Update - September 21 on Facebook Share Weekly Project Update - September 21 on X (formerly Twitter) Share Weekly Project Update - September 21 on Linkedin Email Weekly Project Update - September 21 link

    Work completed Week of September 14 to September 18

    • Sidewalk installation continued on the south side of Muskoka Road 117, east of Brunel Road.

    Work planned Week of September 21 to September 25

    • Surface paving
    • Construction and paving of three raised intersections
    • Install the pedestrian crosswalk electrical components and poles

    Community impacts

    • Motorists can anticipate single-lane closures during road paving.

    Work completed Week of September 14 to September 18

    • Sidewalk installation continued on the south side of Muskoka Road 117, east of Brunel Road.

    Work planned Week of September 21 to September 25

    • Surface paving
    • Construction and paving of three raised intersections
    • Install the pedestrian crosswalk electrical components and poles

    Community impacts

    • Motorists can anticipate single-lane closures during road paving.
  • Weekly Project Update - September 14

    Share Weekly Project Update - September 14 on Facebook Share Weekly Project Update - September 14 on X (formerly Twitter) Share Weekly Project Update - September 14 on Linkedin Email Weekly Project Update - September 14 link

    Work planned week of September 14 to September 18

    • Hwy 117 surface paving
    • Pave raised intersections at crosswalk locations
    • Crosswalk electrical work and pole installation

    Work completed week of September 7 to September 11

    • Crews finished pouring concrete landing pads in this area, which are small, flat concrete surfaces that give people a stable, level spot to step before/after sitting on the new Baysville park benches, once those are installed
    • Sidewalk and curb completion

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues
    • Single lane closures will occur during paving

    Work planned week of September 14 to September 18

    • Hwy 117 surface paving
    • Pave raised intersections at crosswalk locations
    • Crosswalk electrical work and pole installation

    Work completed week of September 7 to September 11

    • Crews finished pouring concrete landing pads in this area, which are small, flat concrete surfaces that give people a stable, level spot to step before/after sitting on the new Baysville park benches, once those are installed
    • Sidewalk and curb completion

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues
    • Single lane closures will occur during paving
  • Weekly Project Update - September 4

    Share Weekly Project Update - September 4 on Facebook Share Weekly Project Update - September 4 on X (formerly Twitter) Share Weekly Project Update - September 4 on Linkedin Email Weekly Project Update - September 4 link

    Work planned week of September 5 to September 9

    • Ditching, clearing roadside ditches to help rain and melting snow drain away from the road, around the roundabout will continue
    • Continue sidewalk work on Muskoka Road 117, east of Brunel Road, across from the Church of St. Kateri Tekakwitha
    • Continue installing poles for the Level 2 Type B pedestrian crossing

    Work completed week of August 31 to September 4

    • Installed light poles for the pedestrian crossing at Bay Street and Muskoka Road 117
    • Continued paving the multi-use trail along Muskoka Road 117
    • Continued ditching

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.

    Work planned week of September 5 to September 9

    • Ditching, clearing roadside ditches to help rain and melting snow drain away from the road, around the roundabout will continue
    • Continue sidewalk work on Muskoka Road 117, east of Brunel Road, across from the Church of St. Kateri Tekakwitha
    • Continue installing poles for the Level 2 Type B pedestrian crossing

    Work completed week of August 31 to September 4

    • Installed light poles for the pedestrian crossing at Bay Street and Muskoka Road 117
    • Continued paving the multi-use trail along Muskoka Road 117
    • Continued ditching

    Community impacts

    • Motorists can continue to expect minor delays along Muskoka Road 117 as this work continues.
Page last updated: 10 Nov 2026, 02:08 PM