Improvements Happening at the Home

CLOSED: This discussion has concluded.
  • Hot Water Boiler replaced
  • Planning to replace the HVAC that serves the laundry room.
  • Two (2) Walk-in Cooler condensers are being replaced this year.
  • The New Generator is on schedule to be installed in the fall; the concrete pad will be installed soon.
  • The Emergency Evacuation Ramp from the Oak Home Area will be replaced to match the ramp on the far side of the home.
  • Gazebo to be installed for residents that smoke at the front of the home to provide shelter that is at least 9 meters away from the front door.
  • New bathtubs have now been installed in our Maple and Birch tub rooms. These state-of-the-art bathtubs feature a technology called Hydrosound.
Share Improvements Happening at the Home on Facebook Share Improvements Happening at the Home on X (formerly Twitter) Share Improvements Happening at the Home on Linkedin Email Improvements Happening at the Home link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>